Name of Project:
National Iranian gas dispatching project
About Project:
System design, equipment supplement, and installation of 506 new remote control terminals, as well as 400 terminals optimization in high-consumption points of the gas network, also design and construction of a backup control center in Isfahan and modernization of Tehran control center and installation of 50 local control centers in 50 important cities of the country.
Objectives:
- Communication between remote terminals and point-to-point testing at stations and dispatching centers
- Social and economic benefits of project implementation:
- Optimal planning in production, transmission and minimization of gas losses
- Improve the reliability of the gas production and transmission system by predicting possible events