Name of Project:

National Iranian gas dispatching project

About Project:

System design, equipment supplement, and installation of 506 new remote control terminals, as well as 400 terminals optimization in high-consumption points of the gas network, also design and construction of a backup control center in Isfahan and modernization of Tehran control center and installation of 50 local control centers in 50 important cities of the country.

Objectives:

  • Communication between remote terminals and point-to-point testing at stations and dispatching centers
  • Social and economic benefits of project implementation:
  • Optimal planning in production, transmission and minimization of gas losses
  • Improve the reliability of the gas production and transmission system by predicting possible events

Related projects